DIRECTION: Study the following table carefully and answer the questions that follow:


The table given below shows the estimated cost of various items (In Iakhs) In a construction project of a real estate company from 2009 to 2012. Study the table and select the most appropriate answers.

Year→

Item ↓

2009

2010

2011

2012

Cement

84

96

95

105

Steel

65

70

72

84

Brick

126

140

150

154

Tiles

32

27

36

40

Hardware

56

60

69

65

Electrical items

12

14

12

20

Other materials

25

31

34

33

If the actual cost exceeds the estimated cost of the company, then the additional cost is cut down by decreasing the cost of bricks. By what percentage of cost on bricks is reduced in 2011 if the actual cost of the company in that year was Rs.486 lakhs?
Options:
A) 9.25 
B) 11.33
C) 12 
D) 16.67
E) 15
Solution:
Actual cost in 2011 = Rs.486 lakhs

Estimated cost in 2011 = 468

so, difference = 18

Number of bricks in 2011 = 150

Hence, Required % = 18 is what % of 150 = 12

Knowledge Expert

· commented

· 1 Months ago

@JOSPHIN SAMUEL from the graph, 95+72+150+36+69+12+34=468

JOSPHIN SAMUEL

· commented

· 1 Months ago

468 kahan se aaya

Knowledge Expert

· commented

· 1 Months ago

Actual cost in 2011 = Rs.486 lakhs

Estimated cost in 2011 = 468

so, difference = 18

Number of bricks in 2011 = 150

Hence, Required % = 18 is what % of 150 = 12